Filled examples / Home

Fictional worked example · Home

Weekly Cleaning Rota Example for a Shared Household

Six concrete tasks show named owners, different progress states and a clear way to catch up on unfinished work.

The studio offers a separate-project load action. No existing project is replaced.

How do I make a cleaning rota that shows who does what and what still needs doing?

Alex and Sam share this fictional weekly rota. Each row describes one practical task rather than a broad instruction such as clean everything. The two owners have three tasks each, but equal task counts do not prove equal effort.

Fictional teaching data. Names, amounts, dates and outcomes are invented. Apply the record structure to your own checked sources; do not treat the figures as recommendations.

Assumptions to keep visible

  • Owners have agreed to the illustrated assignments.
  • Done is recorded only after the task was checked.
  • Product suitability and cleaning instructions are outside the rota.
Tasks6
Recorded complete2
Assignments3 tasks per person

The completed example

6 invented records · Read unknown values as “Not recorded”
Target dateZone / concrete taskAssigned personTask statusSupplies / catch-up
2026-10-19Wipe kitchen worktopsAlexDoneRecorded as completed; follow suitable product instructions.
2026-10-20Empty bathroom binSamDoneCompleted in this fictional example.
2026-10-21Vacuum living-room floorAlexPlannedConfirm access before the planned time.
2026-10-22Change bed linenSamTo doCheck that clean linen is ready.
2026-10-23Review cleaning suppliesAlexTo doCount what is actually present before buying.
2026-10-24Mop kitchen floorSamPlannedCheck floor and product instructions separately.

How to read and use it

1. Write an observable action

Wipe kitchen worktops is easier to review than kitchen. The row tells the assigned person which result to check while leaving the method to suitable guidance.

2. Review unfinished work before adding more

Four tasks are still open. Planned means someone intends to do the work, and To do means it remains on the list. Neither status is evidence that a task was completed.

3. Agree any reassignment

The duty planner can propose a balance by task count, but the household should review actual effort and availability. Applying a proposal changes local notes; it does not notify the other person.

Common mistakes this example avoids

  • Using room names without a concrete task.
  • Assuming that a date or owner makes a task complete.
  • Treating equal counts as equal workloads.

The next useful action

  • Confirm the four open tasks at the next household check-in.
  • Use a separate project for the next week instead of overwriting this record.

← See every filled example · Turn your own notes into a checklist