Backflow Testing Pricing & Renewal Route Calculator
Build a site price from your own technician time, travel, filing/admin, equipment allocation, certification/insurance overhead and margin target. Then see how multi-assembly sites and drive time affect the renewal batch you are trying to complete.
Site workload
Use your own observed field + paperwork times.
Economic cost
Make certification, equipment and travel visible.
Margin & renewal batch
Price first, then test the calendar.
Site cost stack
—Stress test
Base safe price held constantProposed price check
Compare the number you plannedRenewal batch math
Schedule entered by youSaved testing scenarios
Compare sites without sending data to GentleTools.
Multi-assembly sites should share mobilization without hiding incremental work
The first assembly carries the initial trip, access and setup. Additional assemblies can be cheaper because those site costs are shared, but every additional assembly still consumes field and documentation time. Price the actual incremental cost instead of applying an unexplained volume discount.
Filing and administration are billable economics even when they happen later
If the technician leaves the property but the company still spends time entering reports, sending documents, handling portal charges or reconciling the job, that time belongs in the site economics. The calculator keeps those minutes visible.
A renewal book is a capacity commitment
The route model divides the day you entered by the field + admin + drive cycle, then shows the modeled workdays needed for the renewal batch you entered. It does not determine when a device is legally due.